Sunday, May 6, 2007

Community Disengagement, Part I

When we realized the transmission line was soon to be a reality on Grant Road/Gowan Brae, my family had a series of discussions about what to do. We determined to get some information on what had transpired over the very quiet summer leading up to the fall crisis, and we decided to find out who was responsible for the failure of this important community commitment. I spoke at length with several neighbours about the bypass activities, then I gathered public documents, met and corresponded with two government employees and various individuals at Maritime Electric. Over time, this is what I have put together.

In April 2006, government officials left the utility to address our problem with the proposed route for the transmission line. Maritime Electric approached the issue by trying to secure easements (a process similar to getting a right of way, but with more options and privileges) over privately-owned land in the area. To make a long story short, they secured verbal agreement with four parties, surveyed a route, paid for a required botanical analysis to ensure the bypass would not disturb rare flora, manage wetland ecosystems, stream crossings and tree canopies. They revised their transmission line extension document, and submitted a new undertaking proposal to government officials, who approved the change.

Here is a copy of the new document:

http://www.gov.pe.ca/photos/original/melectricEIS.pdf

The Appendices of this document are much more extensive than the first, underscoring the emphasis on ecological protection required of off-road bypass construction.

The Grant Road/Gowan Brae bypass is on page 2 of Appendix A.

However, it seems clear that Maritime Electric did not maintain clear lines of communication with all landowners over the summer, and did not have the level of community agreement that they thought they did. Early fall 2006, when the transmission line construction was already well underway, Maritime Electric broke off discussions with one family over their easement terms and shifting ideas of land use, and our bypass initiative fell apart.

I also learned how, with the transmission line coming down the Grant Road, Maritime Electric put the onus on local people to find another landowner to complete the route. This put considerable time pressure on the entire community to come up with a solution, and it put considerable social pressure on several other people approached to provide a fallback route. Not all of these individuals were community residents. One was temporarily working elsewhere. My neighbours told me that, with time slipping away and Maritime Electric crews waiting up the Grant Road, some landowners were given only days to consider the prospect of a high voltage incursion onto their properties. Ultimately, the individuals approached at the last minute were not comfortable with the prospect of signing over land under these conditions without time to consider the impact. Maritime Electric, citing government-imposed deadlines to meet, abandoned the bypass. They worked round the clock after this decision, erecting most poles by the end of October.

People learned of the bypass failure in a variety of ways. Some, the utility called in person. Others learned through word of mouth. Some learned when they actually saw the crews working in front of their homes. Regardless of how they found out, the effects among the people of Grant Road/Gowan Brae were largely the same: we were all feeling deeply frustrated, disempowered, and angry.

When Maritime Electric left Grant Road/Gowan Brae in the fall of 2007, not only did they leave a transmission line behind them, but they left a wake of ill will. The last minute problems with easements, after a summer of inactivity at the community level, coupled with a brinkmanship approach to getting other local people to sign over land for the transmission line, created much social strife. The demoralization was palpable.

People looked back on the events leading up to the advent of the poles, and community consensus was that the eleventh-hour effort of the utility was meant to distract us all from their overall weak level of commitment to broker a fair deal and protect community interests. Many were, and are, of the opinion that Maritime Electric never had any real intention of pursuing a bypass. We all look at the overall money spent on this wind energy installation, and look to the good care taken to protect the interests of individuals who lived close to the turbines. By contrast, what has happened to our community because of the transmission lines stings like a very sharp slap.

The above narrative quite clearly illustrates several ethical problems with how the utility approached the situation. Let me identify at least two of these as revealed thus far.

Ethical Problem 1: Maritime Electric created a problem which it ultimately took no responsibility for solving.

The utility put forth (and the government approved) a flawed transmission route, and then put the onus on local residents of Grant Road/Gowan Brae to find an alternative when we pointed out the potential harm. In this process, the utility relied on local individuals and community spirit to a.) provide them with options, b.) make preliminary inquiries, c.) do most of the communication and legwork and, d.) encourage all to cooperate. Anyone who “buys into” such a process implicitly takes on ownership of the success or failure. Any integrity a community broker might have with local people is ascribed to a utility that has done little to deserve it. I found myself playing this problematic role when I joined in with this endeavour last fall, and I intend to blog about my discomfort over this in the weeks to come.

Adopting this stance also allowed Maritime Electric to remain conveniently non-committal. They could distance themselves from any “problem” with “uncooperative” people, because any lack of cooperation would be seen as evidence that “the community” itself was to blame for the failure of the bypass.

And why should private landowners give up land when other options are available? Readers might be interested to learn that there is government land which might very well have served the purposes of the bypass, which the utility did not consider at all. (More on this, with maps, to follow in another post.)

Ethical Problem 2: Maritime Electric pursued a route over parcels of private land without offering fair market value for this incursion.

When reviewing the above process, it is clear that the utility, quite intentionally, tried to avoid costs associated with paying landowners for using their land. Any discussion of compensation in the spring of 2006, was put well in the background by Maritime Electric officials. I did not learn until very recently that the utility did not offer any compensation to the four original landowners whom they approached to provide easements over the spring of 2006. In recent weeks, when I probed this issue with utility management, they told me that their employees assured all landowners that rates of compensation among participants would be equitable; if one landowner got any money, they all would get a comparable amount. But the utility at the same time admitted that, under the terms of option agreements signed by three landowners in the spring of 2006, these landowners were allowing the transmission line to cross their land for free.

I find it very difficult to believe that Maritime Electric thought this kind of agreement would hold together. And, it irritated me to no end to learn, as part of my meeting on April 20, that Maritime Electric had had a budget for easement compensation in the spring of 2006. One cannot help but wonder if things might have turned out quite differently if they had used it a year ago.

It should be noted again how the presence of community people like me, and others before me, “working with” Maritime Electric puts the utility in a strong negotiating position when it comes to easement discussions.

The reader of this blog might, at this point, ask, “Where is the provincial government in all of this?” The province is a partner, with Maritime Electric, in the new energy initiative this transmission line was supposed to service. What did they do to represent the community, and be an arbiter this conflict?

That side of this story will be told in Community Disengagement, Part II. The continuation of this post will itemize attempts to contact provincial authorities over the fall of 2006, and try to make sense of the disappointing results of our efforts to find help from this quarter. I will also discuss a third ethical issue with how the transmission bypass was reopened and pursued over the winter of 2006 and spring of 2007.

Sunday, April 29, 2007

Community “Engagement”

I first participated in the public engagement process on March 31, 2006. A week or so before, our family had heard of the transmission line grid expansion though our community from a neighbour who was, quite rightly as it turned out, very concerned by the prospect. He had newly arrived to the Grant Road and had been attracted by the beautiful and peaceful surroundings. The advent of the transmission lines would compromise both. My mother called me and filled me in on this potential problem, and told me there would be an information meeting about the East Point industrial wind energy installation at the end of March. I was living temporarily in New Brunswick, but I wrote to the Deputy Minister of the Department of Environment, Energy and Forestry, and asked for more information about this transmission line. He forwarded my inquiry to the CEO of the PEI Energy Corporation.

I received this as part of an email explaining route rationale, as well as an indication of the size and shape of the poles:

http://www.gov.pe.ca/photos/original/dingwell_mills.pdf

(N.B.: The above document also shows that the original budget for the transmission line was 3.575 million (p. 4). This point will become important in a future post.)

This document shows three routes were considered to take the electricity generated by the turbines from East point to the Dingwells Mills Substation. One potential route runs along the north shore (Route 16). A second runs along the south shore (Route 2 and Route 16). A third route, the one chosen, cuts right through the middle of the province, through the centre of the county.

When the impact of the transmission line became clear, my brother Howlan and I put our concerns to paper, writing directly to the CEO of the PEI Energy Corporation. This was on and around April 1 (April Fool's day). We clearly communicated how coming through our community would do harm, devaluing property and harming the beauty of the place. We pointed out that the north shore route would encourage more wind energy installations in the future (it’s a windy part of the province), and the south shore already had a transmission line. Why were they introducing a new transmission line through our community? The document above makes passing reference to “technical and economic reasons” which ruled out the north and south routes (p.1). This was not enough of an explanation, in our view.

My mother Paulette and brother Conor attended the March 31 information meeting in person, stated our family concerns, and added some personal ones. My mother, a retired nurse and former occupational health and safety instructor, was and is a very health conscious person. She is very concerned about the possible carcinogenic effect of electromagnetic radiation; the high voltage line would ultimately generate 138Kv (which the document above indicates is twice as much as a residential service grid). She also wrote to Minister Jamie Ballem after the meeting and explained her position and her fears in very direct, even emotional, terms.

I should note that, at this planning stage, which highlighted “community engagement,” all of our correspondence was acknowledged. We received answers to most concerns. Our worries, which were aired in person at public meetings, were heard in a very polite and responsive manner. It seemed our concerns were being taken seriously. Everyone felt good.

I should note as well that there were aspects of the transmission route chosen that recommended it. If you look at the maps provided in the appendices of the above document (pp. 6-8), and if you know the area, the transmission line for the most part follows along dirt roads and avoids residential areas. Except ours, that is.

We are on page 7.

On the other hand, a cynic might point out that by cutting through the centre of the province, the transmission lines are as far away from the windy coastal areas as possible. If the utility were ever to be contracted to extend the transmission grid from another new wind energy installation (and the current provincial government plans to make PEI a leader in wind energy), this placement would ensure longer branches to the central transmission line; potentially more dollars from said contracts.

Perhaps I’m misreading the situation, however. Maritime Electric is a partner with the Province of Prince Edward Island in the wind energy installation at East Point, and says that the line transmission was their investment in the project. On the other hand, it seems that their relationship with Ventus, the owners of a private wind energy installation in the western end of the province, is not a partnership and the grid extension to service it was done by commission.

Have I mentioned that Maritime Electric holds a virtual monopoly on Prince Edward Island?

Detailed explanations of these arrangements and partnerships are not part of the public domain, although I will continue to search for them. Either way, Grant Road/Gowan Brae was the community caught in the middle—a seeming “oversight” in the planning process. Still it’s important to emphasize that there were ways around us. One neighbour, who was in attendance at the March 31 meeting, tabled the suggestion of running the line along at least part of the old railway bed, and avoid our homes that way. The decommissioned railroad on Prince Edward Island has been converted into a popular recreational biking, hiking and snowmobiling trail (called the ‘rails to trails’), but as far as I know, no one lives along the route in question. The transmission line could avoid our homes via this government right of way.

Government officials did not seem to like this idea, though, citing public use (more on this point, too, in a blog post to come). Nonetheless, they asked utility representatives on the project to try and find an alternate route to take care of us. Maritime Electric says that the matter was, at this point, left entirely with utility employees.

These individuals seemed to put a plan together quickly. By the end of the first week of April 2006 my mother emailed me to say that an alternate route had been found. Hooray!

It was then that I naïvely made my first mistake. Feeling good about the public process in this province, I didn’t even think to ask for details and considered the problem dealt with. I set into a busy spring and summer of fairly intensive travel. I’ve recently earned a doctorate and I’m on the hunt for a university tenure track job, part of which means I have to hit the conference circuit every year. I visited my mother over the summer occasionally, staying in Souris for a week or two in August, and life went on as usual. The fall saw more travel for me, especially in late September and October.

The first week of November my mother called me to tell me the bypass was a bust and the transmission line was coming down our road.

I’ll continue this story, without going into gossip and hearsay about what went wrong with easement negotiations, in my next post. The focus will instead revolve around the questionable ethics of putting the “responsibility” for solving this problem on a community that had no part in creating it. And it will discuss how government officials, who did play a major part in creating it, just walked away.

Sunday, April 22, 2007

Power in Prince Edward Island

Maritime Electric, a subsidiary of the international power company Fortis, has put up high-voltage power lines that seriously compromise what may very well be the most beautiful place in all of Prince Edward Island (PEI), Canada. The house near Souris where my mother lives sits on top of a hill overlooking the winding Souris River and Northumberland Strait. She is surrounded by forests, farm fields and rolling hills—with what was, no doubt, one of the most spectacular views on the entire Island. More importantly, she is surrounded by good neighbours, all of whom I know to be good people, and most of whom I have known my whole life. I have grown up and live in the nearby capital city, but I still consider these people my neighbours, even though I see many of them only a handful of times a year.

My neighbours and I are caught in the middle of a high-voltage transmission line expansion, built to service a new wind energy installation at the eastern tip of the province. Fifty-five foot poles now tower over a cluster of homes on the Grant Road hill, where my mother’s house is located, and wind down the road through the families who live at the junction of the Souris River Road and the New Zealand Road, at Gowan Brae, which is situated at the head of the River. The poles are very tall, and have thick high voltage power lines strung across them. From our perspective, they cut through our community like a barbed wire fence. Many in our community have serious concerns, not only about the aesthetic impact of this infrastructure, but the health hazards posed by the electro-magnetic fields to our families, and the significant devaluation of our properties the transmission lines bring with them.

It is surprising that the Prince Edward Island government allows these inappropriate power line incursions into rural residential areas. Certainly they have turned a blind eye to our efforts to keep them out. Our community in question is small, which is one explanation. Certainly none of us are wealthy, which may provide another.

What makes our situation so particularly devastating is it was not necessary. My neighbours and family have actively participated, in person and in writing, in a year-long engagement process with the utility and the provincial government. One year ago, Maritime Electric committed to pursuing a bypass away from the homes on Grant Road/Gowan Brae when they planned this new stretch of the transmission grid. The province and the utility, partners in this wind endeavour, quelled community concern by promising to pursue an alternate route—the lines would still come through our community, but they would build along a bypass away from our homes. For one year, the onus was on our community to come up with a route. Guided by criteria outlined by the utility, with the cooperation of several utility employees, we have persevered through some significant setbacks, and have recently succeeded in securing agreement with four very kind local landowners. The stunning generosity and community-mindedness of these cooperative people has been the one bright spot in an otherwise dark and frustrating process.

At the eleventh hour and at the brink of hard-won success, Maritime Electric “ran the numbers” and decided the bypass they worked with us to secure was too expensive after all. At a meeting on Friday, April 20, I was told that the differential cost was about $75,000. This is approximately 2% of the cost for the entire transmission line expansion, estimated at about $3.75 million. According to previous conversations with government employees, this number is less than one half of the amount they spent on a botanical analysis and environmental assessment process (required by provincial policy) to safeguard rare flora and ecologically unstable wetlands/streams.

Less than $100, 000 to save and protect a community is a marginal cost when compared to the investment involved. The utility's decision to bow out, after a year-long commitment and for such a small investment in goodwill, beggars the imagination. The province's refusal to acknowledge our problem is astounding, to put it mildy.

The first iteration of this blog introduction, which I shared with both the utility and government, was extremely angry. I have decided, however, that my anger over what has transpired is beside the point, as larger issues are at stake. As someone who has been close to this issue since last November, I have become aware of very problematic "power relations" in Prince Edward Island. So, I’m going to blog my way into the public domain with this story. I intend to accomplish several things over the life of this blog:

1. This blog will document the story of the abortive Grant Road/Gowan Brae bypass, and show how “efforts to demonstrate goodwill” on the part of Maritime Electric were, in light of this incredible outcome, insufficient to protect rural homes caught in this expansion. Clearly, more than "goodwill" is needed.

2. This blog will critique stated rationales for abandoning the people of Grant Road/Gowan Brae put forth by the utility, and it will systematically analyse the government policies and practices that allow them to do this.

3. This blog will outline the failure of the provincial government to provide leadership and advocacy to our rural community--one of several rural communities on Prince Edward Island bearing the largely hidden burden of high-profile energy initiatives.

4. This blog will provide a forum for discussing what may be called the "inconvenient truths" associated with power line construction. How exactly are they rationalized? Why do rural communities find themselves so disempowered in these situations?

5. Even if we in Grant Road/Gowan Brae ultimately fail to protect our homes, this blog will help other communities. Through the information relayed here, they will be able to learn from our experiences, and be alert, ready and able to provide effective grassroots resistance when the power lines come down their road. The failure to secure a Grant Road/Gowan Brae bypass is a bellwether event that bears close consideration for everyone with a rural home, or anyone who cares about rural PEI.

The way my late father, Dave Mullally, told the story, he was out hunting rabbits one fall day when he came out of the woods at the top of the Grant Road, and “just couldn’t get over the view” of the far-off town, the river, the ocean and the rolling potato fields. My father loved Prince Edward Island. He and my mother, Paulette, bought a lot and a piece of this beautiful place from the O’Keefe family in 1973. They built a house and spent their lives as part of the community on the River, raising five of us in the home at the top of the hill, where my mother Paulette and brother Conor still live.

Last Sunday, April 15, around the time when Fortis/Maritime Electric “ran their numbers” and decided 2% of an infrastructure budget was too great a price to pay to be a good corporate citizen, would have been my father’s 62nd birthday.

6. This blog is a birthday present to his memory.